About Refugees, By Refugees

Portrait of refugee Ahmed hiding his face with his right elbow and the other arm crossed.

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Eleja wearing shades and a black checkered Keffiyeh scarf to cover his head and face

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Adam with his head and face covered with a black cloth and wearing a blue nike sweatshirt with his hands behind his back.

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Omer wearing a puffer jacket with his hands covering his face standing against a brick wall

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Moussa pointing his right forefinger upwards and his left hand holding his sunglasses standing against a tree

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Zuhair wearing a brown hoodie jacket and a scarf covering the lower half of his face with his hands crossed and resting on his torso

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Yassin with his hands holding the back of his neck and looking down wearing a basketball jersey

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Ali wearing a plaid shirt with his hands in his pant pockets

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more
Portrait of refugee Patoo standing sideways wearing a facemask against a brick wall

Ahmed

“At the end all I wanted was to take my children to safety,” says Ahmed (pseud, 45). A tr

Read more