About Refugees, By Refugees

Nooshin Sanjabi
Pictures taken in:
Pictures taken in:
Iranian
My name is Nooshin Sanjabi. I’m 25 years old and from Iran. I’ve been in Germany since 2018. I’ve done a 2-year trainee program as a draftswoman and also graduated from a german high school. As I can remember I am a journalism and activism enthusiast, I do my own Podcast, try to connect the 2 cultures I have in me now, and change the world in a good way, even on a very small scale. At the moment I am applying for sociology studies and different journalism trainee programs. I don’t believe in dreams but I wish to be a good journalist and bring different issues from a different narrative into the light. That was my honor to be on such a great program with witness change and I’m very grateful for it.






